Projects

2021


Southcraig Campus – Gymnasium, Trampoline Pit.
We prepared the sub-floor using Ardex NA screed, thereon and installed Forbo Tessera Layout carpet tiles.

Entrance – Heckmondwicke Diamond heavy duty carpet tiles were installed in this area.

1050 Shettleston Road, Glasgow – Full install of flooring in a large number of flats throughout kitchens, bathrooms and bedrooms for our client.
We installed a selection of Altro Wood safety flooring in the bathrooms and kitchens, Karndean Knight carpet tiles in the bedrooms.


Bellrock Street, Cranhill – We carried out flooring works for our client in these newbuild flats as part of a large installation project, including
corridors, toilets with Tarkett granit safety flooring. Altro Walkway 20 flooring was fitted in the Dining/Day Room.

Skypark Suites, Glasgow – We worked in conjunction with many other trades fitting out these office spaces on Floors 3 & 6 during this project. Our client’s
specification was for Forbo Surestep, dressed up cove and a selection of Karndean Knight and Forbo Tessera Nexus carpet tiles throughout.

Skypark Suites, Glasgow – The Lobby area was installed by our team using Karndean Art Select wood effect for a striking finish in this entrance lobby.

Asda Govan – Sushi Daily – In the Main Entrance, we applied a moisture suppressant Ardex MVS 95, followed by Ardex screed to prepare the sub-floor.
Thereon, we supplied and installed Forbo Surestep vinyl for a safe, hard wearing floor in a busy traffic area.

Berryhill Road, Glasgow – These newbuild flats were fitted with Forbo safety floor and Forbo Coral Duo in the Main Area and Entrance Area for our clients.

Beaverbrooks Jewellers, Edinburgh – Main Sales Floor – As part of a full refit for our client, we supplied and installed Edel Telenzo carpet throughout this
area and Altro Contrax safety floor to Back of House.

Breitling Jewellers, Glasgow – Another stunning refit requested by our client, to supply and install CS Pediluxe in the Entrance, Burmatex Academy carpet tiles
in the office, and carry out vinyl repairs Back of House.

Falkirk Libray – Main Area and Toilets – Our client’s specification was for the supply and installation of Polyflor Camaro wood and Polyflor Polysafe Ultima
to renew the flooring in these areas.

Grange Academy, EAC – Classrooms – A large number of classrooms have been fully refitted here by us over the years, working in conjunction with other trades on
site during school holidays to replace existing flooring with new Forbo Real Marmoleum.
Shortlees Primary, EAC – Various Classrooms flooring all renewed as part of the Lifecycle works in these busy schools.

Frognal House – Staff Toilet Block – Karndean Opus was our client’s specification for this project, supplied and installed by our team.

Monklands Hospital – Reception Area – Our client specified Polyflor Polysafe Mosaic PUR for this busy traffic area, supplied and installed by us, finished with
sit-on cove.

Benugo Cafe – Flooring and Wall cladding – The selections here were for us to install Polysafe Quicklay flooring and Altro Whiterock wall cladding as a hygienic
option for this busy cafe.

2020

Carluccio’s Dublin – 2 Restaurants – We installed a DPM, followed by Altro safety flooring, nosings and matting to Back of House and Stairs as part of a full refurbishment in the restaurants. 

 

Hard Rock Cafe – Glasgow & Edinburgh – We installed Altro Whiterock and safety flooring behind the bar area and stairs.

 

Sarti – Bath Street, Glasgow – The Kitchen Area was installed with Altro Whiterock to the walls.  Floors required grinding, DPM and new Altro safety floor was installed, all on a nightshift basis to allow minimum disruption in a busy restaurant.

 

Bar Burrito, Edinburgh Airport – We installed Forbo vinyl, wooden flooring and Altro Whiterock to the walls in the kitchen and bar area.

 

Prezzo, Silverburn – We carried out kitchen floor repairs here, working nightshift to cause minimum disruption to the clients.

 

Zizzi – Princes Square & Royal Exchange Square – Ceramic wall tiling was carried out, installing resin coving and corner protectors

 

Brewdog, Edinburgh Airport – We supplied and installed Altro safety flooring and Whiterock to walls, Havwood wooden flooring and CAT trims.

 

Lodge on the Loch – A Flowcrete resin flooring system was installed in the kitchen area for our clients.

 

Robin’s Nest – Amtico and Altro wooden flooring were installed to the toilet areas, Calderdale carpet to the main restaurant.

 

Sheep Heid Inn – Installation of Calderdale carpet and Altro Whiterock will be carried out here shortly

 

Tarbet Hotel – We supplied and installed around 4000m2 of carpets, safety floor and Amtico wooden flooring throughout en-suites, bedrooms and corridors in the hotel.

 

Grosvenor Hilton – We supplied and installed Westex carpet in the Botanic Suite for our client.

 

Hilton Glasgow – Karndean wooden flooring was installed here for our client.

 

Department of Work & Pensions – Edinburgh, Glasgow & Inverness – Altro Whiterock and carpet tiles supplied and installed throughout various areas of the branches.

 

Ineos, Grangemouth – Our client required installation of Altro Xpresslay throughout their office areas.

 

St Vincent’s Hospice – Installation of Altro walls and floors in toilets/wet rooms and kitchen

 

Strathcarron Hospice – We have carried out extensive flooring works throughout the hospice including Milliken carpet in the corridors, seminar room, safety flooring in the toilets and Doctor’s rooms, while taking into account the sensitive environment.

 

Raasay Distillery,Visitor Centre & Hotel – We supplied and installed around 300m2 of carpet, 500m2 of Nora rubber flooring instairs and landings, bedrooms and corridors in the newly opened distillery on the island.

 

Edinburgh Castle – We recently supplied and installed Object Carpet to The Gatehouse

 

Trinity Church – We have recently completed installation of Altro flooring, Interface carpet tiles and Altro Whiterock on this project.

 

Glenapp Castle – Recently carried out Altro flooring and Whiterock walls in the kitchen & prep rooms as well as the stairs.

 

Multi-Storey Flats, Greenock – We supplied and installed safety flooring of 6000m2, barrier matting and ceramic tiling on this project.

 

Schools – We have a wide experience in the supply and installation of all types of flooring in schools throughout Ayrshire (5000m2), North Lanarkshire (7000m2), East Dumbartonshire and Glasgow during holiday periods throughout the year. 

 

Michael Kors, Glasgow – We recently supplied and installed new carpet to the shop floor in Buchanan Street.

 

B&Q Ayr & Stirling Stores – Recently completed flooring works in both stores in Staff Canteen, Quiet Room, using QuickStep Paso Natural Oak and installed MMA flooring to the ladies, gents and disabled toilets.

Comments are closed.